Accurate. Reliable. Integrity You Can Trust.
Los Angeles, CA carlos@uiindt.com
Home About Services Phased Array Ultrasonic Testing Ultrasonic & Volumetric Inspection Tube & Electromagnetic Inspection Conventional & Access Testing Specialized Damage Detection Industries Contact Request a Quote
Los Angeles, CA
carlos@uiindt.com
Tube Inspection

Tube & Electromagnetic Inspection

IRIS, Eddy Current and Surface Array inspection of tubes, heat exchangers, boilers and condensers — screened fast, then quantified where it counts.

Refinery process equipment and exchanger bundles
Bundle IntegrityScreen the population, measure what matters.
Overview

Thousands of tubes. One that will fail.

A heat exchanger, condenser or boiler bundle can hold thousands of tubes, and the one that fails is the one nobody looked at. Tube inspection is therefore a screening problem first and a measurement problem second: cover the whole bundle fast enough to be practical, then quantify the tubes that matter.

We run that two-stage approach. Electromagnetic techniques — bobbin eddy current for non-ferrous tubing, surface array for welds and component surfaces — screen the population and flag the outliers. IRIS then returns a quantitative, full-circumference wall thickness profile on the flagged tubes and on a representative sample of the rest, so the screening data is anchored to real measurements.

The output is a tubesheet map you can act on: which tubes to plug, which to monitor, and what the bundle as a whole is doing.

Methods

Three techniques, one workflow.

01

IRIS — Internal Rotary Inspection System

An ultrasonic probe with a rotating mirror travels the tube bore and measures wall thickness around the full circumference. Quantitative, works on both ferrous and non-ferrous tubing, and reports an actual remaining wall rather than a percentage estimate.

02

Eddy Current Testing (ECT)

Bobbin-probe screening for non-ferromagnetic tubing — copper, brass, admiralty, cupronickel, titanium, austenitic stainless. Fast, high-coverage detection of pitting, wall loss, erosion and cracking.

03

Surface Array / Eddy Current Array

Array coverage of surfaces and welds in a single pass, detecting surface-breaking and near-surface cracking. Tolerant of thin coatings, which often avoids the cost and downtime of stripping paint for MT or PT.

Choosing the Technique

Which method suits which bundle.

Tube material dictates most of the decision; condition and access decide the rest.

TechniqueTube materialGives youTrade-off
Eddy Current (bobbin)Non-ferromagnetic onlyFast full-bundle screening; defect type and approximate % wall lossComparative rather than absolute; not valid on ferromagnetic tubes
IRISFerrous and non-ferrousAbsolute wall thickness, full circumferential profile, defect shapeSlower; tubes must be cleaned and water-coupled
Surface Array / ECASurfaces and welds, ferrous or non-ferrousSurface and near-surface crack detection with positional dataSurface and near-surface only; not a volumetric method
Equipment

Bundles we inspect.

  • Shell-and-tube heat exchangers
  • Air-cooled exchangers and fin-fan bundles
  • Surface condensers
  • Water-tube and fire-tube boilers
  • Feedwater heaters and economisers
  • Chillers and refrigeration bundles
  • Reboilers and overhead condensers
  • Carbon steel, stainless, copper alloy and titanium tubing
Codes & Standards

Worked to the code that governs your asset.

Reporting thresholds and plugging criteria are set against your written practice or the governing standard for the bundle.

  • ASME BPVC Section V, Article 8 — Eddy Current
  • ASME BPVC Section V, Article 5 — UT
  • API 510
  • API 572 — Pressure Vessel Inspection
  • HEI Standards
  • ASNT SNT-TC-1A
Deliverables

What you receive.

Every job closes with documentation your engineering, reliability and integrity teams can file, audit and act on.

  • Tubesheet map colour-coded by severity
  • Tube-by-tube results with defect type, depth and axial position
  • Percentage wall loss distribution across the bundle
  • Absolute remaining wall from IRIS on measured tubes
  • Plugging and retubing recommendations against your criteria
  • Comparison against previous bundle inspections you supply
  • Raw data files for your integrity records
  • Signed report issued before demobilisation where scope allows

Bundle coming out at the next turnaround?

Send us the tube count, material and bundle history — we'll scope the screening and the verification sample.